ZQ II:
As one of the top construction companies in Islamabad, Constructo was brought in to resolve a critical structural challenge at the ZQ II project in G-6. The basement, built by a previous contractor, had misaligned columns, an issue our team corrected by re-laying column positions floor-by-floor and adjusting rebar with precision.
Our role included all above-ground grey structure construction, delivered with a focus on quality and cost-efficiency. Our streamlined execution allowed us to finish the entire frame structure in just four months, reinforcing our reputation among the best builders in G-6 Islamabad.
True to The Constructo Way, our team maintained a clean, organized site throughout construction, minimizing risks, reducing waste, and delivering high-quality results that reflect our standing as a leading contractor in Pakistan.